Desks move easily. Technology decides whether anyone can work on Monday. Servers, workstations, phones, network gear, cabling, and software access all have to come down and go back up in a specific order, and the order has to be planned weeks before the truck arrives.
We are Salt Lake City movers handling commercial relocations across the metro, and the businesses that reopen without losing days are the ones whose IT plan existed before the move date was set. The physical move is the straightforward half. The sequencing is the part that needs attention.
Audit the Equipment Before Anything Is Packed
Walk the office and write down what is actually there. Every computer, monitor, phone, printer, server, router, switch, scanner, dock, and anything specialized to your business belongs on the list, along with where it currently sits and who uses it.
The audit does two separate jobs. It tells the moving crew and the IT team what has to travel and what handling each item needs, which drives crew size, materials, and the order of loading. It also tells you what should not travel at all.
That second question is worth real attention, because an office move is the natural moment to retire aging hardware, return leased equipment, and dispose of devices nobody has logged into for a year. Moving equipment costs money and moving equipment you are about to replace costs the same money for no return. The same logic applies to a household, and downsizing belongings before a move makes the case in that context.
Bring IT Into the Planning Early
Your IT team or external provider needs to be part of the conversation from the start rather than the week before. Disconnection, backup, reconnection order, network setup, and testing all take time to plan and more time to execute.
Put the questions to them early and in writing. What has to be backed up and when. Which systems need shutting down in a particular sequence. How long setup will realistically take at the new address. What equipment needs special handling or cannot be moved by a general crew. What is being replaced, upgraded, or retired as part of the move.
Those answers shape the entire move schedule rather than just the technology portion. A reconnection sequence that takes two days changes which weekend you choose, and finding that out late is how a move turns into a week of partial operation.
Back Up Everything Before Anything Is Disconnected
Every server, workstation, and storage device should be backed up before it is unplugged, and the backups should be verified rather than assumed.
Use whatever method your provider recommends, whether cloud, offsite, or both. The critical part is testing a restore before move day rather than finding a backup problem at the point when the original hardware is in a truck. A backup nobody has tested is a plan rather than a protection.
This step does not have exceptions. Hardware can be replaced within days and insured against. Data that existed in one place and stopped existing during transit is often unrecoverable at any price, which is a different category of loss entirely.
Prepare the New Space Before Equipment Arrives
The new office should be ready to receive technology before any of it shows up. That means knowing where the server room or IT closet sits, where workstations and printers go, where conference room equipment lives, and where access points need to mount.
Check capacity against the plan rather than against the floor plan’s appearance. Confirm there are enough power outlets and data ports in the right places, that circuits can carry the load in the server room, and that the cabling supports the speeds you need. Older commercial buildings in Salt Lake City frequently need cabling work or outlet additions that take a contractor several days to schedule.
Handle that work before move-in rather than after. Cabling done after the equipment arrives means working around furniture, around staff, and often around a live business, which costs more and takes longer than doing it in an empty space. Building requirements belong in the same early conversation, since most office properties require a Certificate of Insurance before permitting a move at all, which is worth confirming alongside the rest of your mover vetting.

Label Every Cable and Every Device
Unlabeled cabling is the single largest avoidable delay in an office move. A rack that comes apart without labels takes hours to reassemble correctly and sometimes does not reassemble correctly at all.
Label both ends of every cable before anything is disconnected, and photograph each rack, each desk setup, and the back of anything with more than two connections. Label devices as well, using employee name, department, workstation number, or destination room depending on how the new space is organized.
This matters most where equipment looks identical. Shared printers, matched workstations, stacked switches, and conference room systems are where a missing label turns into a guessing exercise. Photograph each configuration before it comes apart, and keep those images somewhere the person rebuilding it can reach them.
Planning an office move around a weekend window? Give us the equipment list and your IT timeline and we will build the move schedule to match the reconnection order.
Move Servers and Sensitive Hardware Differently
Servers, switches, network gear, and precision equipment need different handling from desks and filing cabinets. They are sensitive to impact, to vibration across a long drive, and to being loaded in a position they were never designed to sit in.
Use original packaging or dedicated cases wherever they exist. Where they do not, equipment needs padding on all sides and secure positioning so nothing shifts in transit. Rack-mounted gear should come out of the rack rather than traveling in it unless the rack is built for transport.
An office move is also a reasonable moment to ask your provider whether on-premise hardware still makes sense. That is not automatically a yes, and plenty of businesses have good reasons to keep equipment in the building. It is worth a conversation before physically relocating aging servers, since the alternative answer changes what needs to move.
Schedule Setup Before Staff Return
The goal is employees arriving to working systems rather than waiting while machines are connected. That means the IT setup finishes before the first business day in the new space, which in practice means evenings or a weekend.
The move schedule has to accommodate that. Equipment has to arrive early enough for the IT team to work, in the order they need it, with network infrastructure already live. A delivery that lands at six on Sunday evening leaves no useful setup window before Monday.
Our commercial moving crew works after-hours and weekend schedules across Salt Lake City for this reason, and we stage deliveries so technology arrives when the IT team is ready for it rather than all at once. Tell us the reconnection order and we will load the truck against it, so the server gear is not behind forty desks when your provider needs it.
Test Before You Call the Move Finished
A move is not complete when the equipment is in place. It is complete when the systems work, and the gap between those two states is where the remaining problems live.
Test every workstation against the network. Check phones, printers, wireless coverage in each area, shared drives, software access, conference room equipment, and anything the business cannot operate without. Walk the space and test from where people actually sit rather than from one desk near the router.
Finding a dead port during a planned test window is a small problem. Finding it at nine on Monday with staff waiting is a different one, and the only difference between the two is when you looked.